ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN BETON BERTULANG MENGGUNAKAN METODE TIME STUDY

(Studi Kasus: Proyek Pembangunan Rumah Sakit Gading Medical Bengkulu)

Authors

  • Meilani Belladona Universitas Prof. Dr. Hazairin, SH
  • Edito Dwi Antoro Universitas Prof. Dr. Hazairin, SH
  • Arif Sandra Universitas Prof. Dr. Hazairin, SH

Keywords:

Reinforced Concrete Work, Worker Composition, Worker Productivity, Time Study

Abstract

Abstract

Construction  management  work  must  take  into  account  the  composition  of  workers.  recruitment  of  workers, direction  of  workers,  supervision  of  workers  and  others.  The  composition  of  workers  will  affect  work productivity.  The  better  the  qualifications  of  workers,  the  higher  productivity  of  workers.  The  purpose  of  the study  was  to  analyze  the  factors  that  affect  worker  productivity  in  reinforced  concrete  structures  in  the  Ivory Medical Hospital construction project in the City of Bengkulu. Data collection methods use observation and data analysis  using  the  Time  Study  method.  Based  on  the  calculation  results  obtained  the  value  of  worker productivity, namely for column formwork work; 8.92 m² / Oh, beam; 7.25 m² / Oh and plates; 24.32 m² / Oh. In column reinforcement installation work; 473.57 Kg/Oh, beam; 126.31 Kg/Oh and plates; 378.22 Kg / Oh and for column casting work; 50.44 M³/Oh, beam; 15.57 M³/Oh and plates; 5.14 M³/ Oh. The factors that cause the lack of  productivity  of  workers  in  the  work  of  installation  formwork  is  the  distance  of  the  material  sites  and  the number of workers, while the factors affecting reinforcement work are the weather and the position / location of the material which is very far from the installation site.

Published

2019-01-08